CTP completes first phase of CTPark Warsaw Janki, second building under construction

5 February 2026

CTP has completed the first phase of its industrial and logistics park in Puchały near Warsaw and obtained the occupancy permit for a warehouse building with an area of approximately 9,100 square metres. The facility was developed in the CTFlex format, which is designed for smaller units primarily aimed at small and medium-sized enterprises. At the same time, construction is continuing on a second building of around 22,000 square metres.

CTPark Warsaw Janki is one of several CTP warehouse projects in the Warsaw metropolitan area. The site is located close to the S8 expressway, providing direct access to Warsaw and key national transport routes. The newly completed hall was planned to allow division into modules of roughly 1,500 square metres, enabling flexible arrangements for different tenants.

According to CTP Polska, the second building is already at an advanced stage of construction and is expected to be delivered later this year. The full project is planned to include five buildings, increasing the volume of immediately available warehouse space in the southern Warsaw region, near Chopin Airport.

The general contractor for the first building was Depenbrock. The complex is being developed on a plot of just over 13 hectares. In addition to standard technical parameters, the design includes features intended to improve working conditions, such as increased natural lighting throughout the warehouse and translucent façade panels in selected areas.

LATEST NEWS