Panattoni has secured €27.5 million in financing from Bank Pekao for City Logistics Łódź V, a 42,700 sqm industrial development on the site of a former ABB factory in eastern Łódź. Construction is scheduled for completion in the first quarter of 2027. Located on Lodowa Street, the project involves the redevelopment of former industrial land into logistics facilities serving urban and nationwide distribution networks. Two tenants have already committed to approximately 24,000 sqm, representing around 56% of the development’s planned space. PGC Polska Grupa Ceramiczna will occupy nearly 15,000 sqm, while logistics operator Zadbano has leased approximately 9,000 sqm.
Emilia Taczewska-Trojańska, Head of Debt Finance Poland at Panattoni, said the financing would support the company’s expansion of industrial properties within urban areas, combining the redevelopment of former manufacturing sites with facilities adapted to current occupier requirements. The development is located approximately 10 km from central Łódź, with connections to the A1 and A2 motorways and the S14 expressway. Its location within the city provides access to both the local labour market and urban distribution networks. Panattoni is targeting BREEAM Excellent certification for the development, incorporating measures intended to reduce energy and water consumption.
The transaction highlights the continuing role of bank financing in Poland’s industrial property sector, particularly for developments that have secured substantial tenant commitments before completion. The redevelopment also reflects the changing use of former manufacturing sites in Łódź, where established industrial locations are increasingly being adapted for logistics and distribution activities.