Panattoni has started construction of a 46,000 sqm build-to-suit (BTS) logistics facility for Nagel-Group in Poznań. The project will be delivered within Panattoni Park Poznań East III and is intended to serve as the company’s main operational site in Poland.
Nagel-Group, which specialises in food logistics, plans to consolidate four existing warehouse locations in the Poznań area into the new facility and relocate its local headquarters to the site. The move is designed to centralise operations within a single logistics property.
The warehouse will be configured to meet the tenant’s operational requirements, including temperature-controlled zones. Cold storage areas will operate at 2–4°C, while other sections of the building will maintain temperatures between 16–18°C.
The development will include an 11,000 sqm cross-dock area with 66 loading docks, as well as a three-storey office component. The site will provide approximately 300 parking spaces for cars and 120 spaces for heavy goods vehicles. The park is located near the A2 motorway, offering direct access to national and international transport routes.
The project is expected to incorporate environmental solutions such as a wastewater treatment installation and heating systems supported by heat recovery from refrigeration processes. The building is planned to obtain BREEAM certification at the Excellent level.
Construction works are scheduled to begin in the first quarter of 2026.
The Poznań region remains one of Poland’s established logistics markets, supported by transport infrastructure and access to labour. Panattoni has previously delivered multiple logistics projects in the Greater Poland region and continues to expand its presence there.