Croatian-based Ivicom Consulting, a unit of Austria’s Ivicom, has obtained a concession for the construction of a wind park with a capacity of up to 40 MW in the Una-Sana Canton in Bosnia.
The UNA wind farm will be built in Bihac municipality and will consist of 8 wind turbines, each with a capacity of 5 MW, accordcing to the ministry. The project’s total cost is around some EUR 25.6 million.
In January the government of the Una-Sana Canton issued a public call to grant a 30 year concession for the wind park project. Now the winner of the tender will be expected to research, design, construct, equip, use and maintain several wind turbines.